Monday, September 8, 2008
Error in the plans
Talked with Ray tonight - due to an error made in the plans (an assumption of 12 inch instead of 10 inch ceiling joists in the existing structure), it turns out that the extra support is required - so, we're going to end up with a smaller opening in the A/V niche - but it will be enough to hold the equipment (and should have a little "hidden" storage to the right to boot..) - should work out just fine.
Subscribe to:
Post Comments (Atom)
1 comment:
There is ALWAYS a glitch with any construction project... Luckily our builder was on top of things even before we realized there was a problem with it. Luckily too it will work out in the end..there even is a "secret spot" for Chris to hide his "magazines and videos"...lol
Post a Comment